CAPACITY
CAPACITY
CAPACITY
Design and development capability
R&D personnel

4 senior engineers, 5 design engineers, 1 welding engineer, 1 non-destructive testing engineer, 1 material engineer, 12 assistant engineers, 2 pressure vessel A1 and A2 auditors

Design software

ASPEN EDR

Finite element analysis ansys

Solidworks

Comprehensive performance test of heat exchanger

Wind tunnel testingThermal shockPressure alternating testSalt spray testCleanliness testing

Manufacturing capability
Monthly production capacity reaches 680 tons

The maximum monthly production capacity is 680 tons. There are a total of 8 vacuum brazing furnaces, including 3 large vacuum brazing furnaces with a maximum brazing size of 10000 * 1500 * 1700mm

Senior technical team

Gathering a senior domestic technical team, with core members including brazing process experts and over 40 years of industry experience

Standardized operation throughout the entire process

Establish standardized operating procedures for the entire process of heat exchanger manufacturing, equip with professional automated welding production lines, and achieve breakthroughs in both process innovation and production quality and efficiency.

/